iCab — the cabinet, before it is wired.
The control cabinet as a working twin. Inverters, protection devices and soft starters sit on their rails as virtual devices that behave like the real ones: they ramp, they trip, they heat up — and they turn the machine.
What iCab does.
-
A cabinet you can open
Cabinets with DIN rails in 3D. Each device occupies its 17.5 mm slots, so what fits in the twin fits on the rail.
-
G120C inverters, by vendor
Models of SINAMICS G120 and V90, Danfoss FC 302 and PowerFlex 755 drives, each with its own drive profile and control word.
-
Drives that behave
Enable logic, ramps, faults and a thermal model: the heatsink warms under load and cools back to ambient.
-
Protection that trips
Circuit breakers and motor protection with their trip behaviour, plus soft starters and thyristor controllers.
-
From cabinet to shaft
The inverter drives a motor, the motor a gearbox, the gearbox the rollers. A setpoint in the cabinet becomes speed on the machine.
-
Parameters, like the real drive
The AI reads a drive's parameter set, stages changes, downloads them and binds the drive to its motor — the commissioning steps, on the twin.
A real controller cannot tell the cabinet is virtual.
Put the virtual drive on the fieldbus and the unchanged controller connects to it as if it were silicon. That is the cabinet's part in Machine Dreaming.
A virtual drive on PROFINET
The controller establishes its connection and exchanges cyclic frames with the dreamed drive.
shippingThe same parameters to the real drive
A parameter set rehearsed on the twin, written to the physical inverter and verified by readback.
visionDrag-and-drop cabinet layout
Today the layout is authored from the command line; a graphical editor on the same rail logic is next.
visionWhat a virtual cabinet is for.
Commission the drive before the cabinet exists
Set the parameters, enable the drive and watch the motor follow — ramps, limits and faults included — while the panel is still being built.
Train on faults you would never provoke
Trip a breaker, overload a drive, lose an enable. Operators and commissioners learn the response where nothing can burn.
Check the layout before the panel shop does
Place the devices on their rails and see what fits, next to the machine they will drive.
Supplier twins belong in one public store.
Browse exact cabinet components, see what has been qualified, and install only releases whose source, signature and payload all verify.
The first reviewed preview is the Siemens SINAMICS G120C PN 11 kW with documented FSC mounting and 37 connection points.
Browse the public catalog →Made for developers, engineers, commissioners, operators and maintainers — and finally for great industrial products.
Tell us your machine, and upgrade it to the highest level with ISNESS.